Oracle 11i Application Developer – Technical FAQ – Part 2


Hello Friends, here is the second set of Questions on Application Developers , more of general questions, i am not digging in particular areas , only trying to put question which i normally ask with candidates. If you want help in any specific areas , plz advise, i will try to do that.

Q11 ) What is SET-OF-BOOKS?
Collection of Chat of Accounts and Currency and Calendars is called SOB

Q12 ) What is the interface?
Interface Table is a table which is used as medium for transfer of data between two systems.

Q13 Tell me what is the procedure to develop an interface?
a. First we will get the Requirement document.
b. We will create control file based on that plot file.
c. Then the control files which loads the data into staging tables.
d. Through pl/sql programs we will mapping and validate the data and then dump into the interface tables.
e. Through the standard programs we will push the data from interface tables to Base tables.

Q14) What is multi org?
“Legal entity has more than one operating unit is called as multi org”
a) Business group — Human resources information is secured by Business group
b) Legal entity. — inter-company and fiscal/tax reporting.
c) Operating unit — secures AR, OE, AP, PA and PO Information.
d) Organizations — is a specialize unit of work at particular locations

Q15) What are the User PARAMETERS in the Reports?
P_CONC_REQUEST_ID
P_FLEX_VALUE

Q16) FND USER EXITS:-
FND SRWINIT sets your profile option values, multiple organizations and allows Oracle Application Object Library user exits to detect that they have been called by an Oracle Reports program.
FND SRWEXIT ensures that all the memory allocated for AOL user exits have been freed up properly.
FND FLEXIDVAL are used to display flex field information like prompt, value etc
FND FLEXSQL these user exits allow you to use flex fields in your reports
FND FORMAT_CURRENCY is used to print currency in various formats by using formula column

Q17) what are the two parameters that are mandatory for pl/sql type concurrent program?
Procedure/function (ERRBUF OUT
RETCODE OUT
………………….)
ERRBUF :- Used to write the error message to log or request file.
RETCODE :- Populate log request file with program submission details info.

Q18.) What is Value Set?
–The value set is a collection (or) container of values.
–When ever the value set associated with any report parameters. It provides list of values to the end user to accept one of the values as report parameter value.
n If the list of values needed to be dynamic and ever changing and define a table based values set.

Q19) What r the validation types in Value Set?
1) None ——– validation is minimal.
2) Independent ——input must exist on previously defined list of values
3) Dependent ——input is checked against a subset of values based on a
prior value.
3) Table —– input is checked against values in an application table
4) Special ——values set uses a flex field itself.
5) Pair —— two flex fields together specify a range of valid values.
6) Translatable independent —– input must exist on previously defined list
of values; translated values can be used.
7) Translatable dependent ——- input is checked against a subset of values
based on a prior values; translated value can be used.

Q20) Who information’s?
1) Created by
2) Creation date
3) Last _updated by
4) last_update_date

Thanks  — Shivmohan Purohit

Oracle Applications / Financials – Functional Question on General Ledger – Budgeting


Oracle Applications / Financials – Functional Question on General Ledger – Budgeting. Quite useful as FAQ and Interview Questions for General Ledger.


11. What is Set of Books? What are the four conditions when you change your SOBs?SOB is of 2 types – Primary and Reporting.Primary SOB – All transactions are with functional Currency


12. What is an Invoice?
AR invoice is a document sent to the customer with details like, Bill-to customer code, product code, qty sent, price, currency, credit terms, tax details, etc. Based on this invoice, customer will make payment to the company and the same is applied against the invoice. AP invoice is the document received from the supplier and contains information such supplier details, product code, qty, price and tax details. This invoice is entered in the AP module and payment is made to the supplier against this invoice.
There are 2 types of invoices-

1. Periodic 2. Milestone

Also, Invoice is an information sheet which a company sends to the buyer along with the good. It explains the details of the goods in the shipment and also the prices. Invoices can contain all sorts of data regarding the shipment and goods depending on the company and product.

13. Can you disable budgetary control for a set of books?

You can, however existing encumbrances are not cleared from the feeder systems. Therefore it is not recommended. If you do change the budgetary control options for an existing set of books, you must do two things for the change to be reflected.

–Run the Period Map Maintenance concurrent request, it must complete successfully.

–Exit Oracle Applications and restart. You must completely exit the application…it is not sufficient to select Sign on again from the Oracle Applications Special menu.

14. Is there a limit to the number of periods in a budget year or how many years a budget can span?

There is no limit for the budget. One can define budgetary control for n number of years however, one year can have maximum of 60 fiscal periods.

15. Why don’t my Detail budgets roll up to my Master budget?
Detail budgets do not automatically roll up to the master budget. The GL uses summary accounts to maintain master/detail budget relationships between them.

16. I was able to post a budget journal to a closed period, why?
Yes, a budget journal can be posted to any period that is in an open budget year for that budget. This is regardless of the status of that period. The budget journal is not linked with your accounting period. Once you have open the budget period then you can book budget journal for that whole period.

17. How many ‘Current’ budgets can you have?
For each set of books, you can have only one current budget at any point in time. The only distinction between a ‘current’ and an ‘open’ budget is that the current budget defaults into the budget field on several budget-related forms. It can be replaced however by any ‘open’ budget in the field.
18. What is a funding budget?

Funding budget is a budget against which accounting transactions are checked for available funds when budgetary control is enabled for your set of books. Funding Budgets are approved budgets.Two types of budgets are there in Oracle Apps: 1- Fund 2- Plan.

Fund budget create the Budget Journal but plan budget used only for planning. Fund budget requires journal entries, and is assigned to a summary template or account range in the budget org, where the funds check level is set at Absolute or Advisory. It is the assignment that makes it a ‘funding budget’; it is not done at the budget definition level.

19. Why is my budget requiring budget journals?
At the set of books level that option is not enabled? This would happen when the budget itself is defined to require budget journals. This is done at the budget definition level.

20. Why can’t I inquire on my budget amounts from INQUIRE/BUDGETS navigation path?
The Budget Inquiry form (GLXIQBUD) is used to perform inquiries about master and detail budgets. GL compares summary balances between your master and detail budgets, and checks for budget variances and violations. This form only looks at summary accounts. To inquire on detail accounts you must use the navigation INQUIRE/ACCOUNTS, and choose the ‘budget’ amount type.

21. If I delete my budget org, will the budget amounts be deleted?
No, the amounts will be same. Deleting the budget organization does not remove the budget amounts from the GL_BALANCES table.

22. Can I update/adjust an existing account range in my budget organization?
Yes you can update an existing account range in Budget Organization.

23 How many times can a budget be purged?
Budget can be purged only one time.

24. Why is there no value in the REQUEST_ID column of GL_BUDGET_INTERFACE for rows with data that failed to be uploaded by the Budget Spreadsheet Upload program?
You are trying to open the next budget year. After navigating to the form and querying the budget, you notice the [Open Next Year] button is grayed out. You find that Account code combinations are not being added to the Budget Organization.
25. Why don’t my Detail budgets roll up to my Master budget?

Detail budgets do not automatically roll up to the master budget. The GL uses summary accounts to maintain master/detail budget relationships between hierarchy levels. Summary templates are defined so that accounts in your lower level detail budgets roll up into the same summary accounts as the detail accounts in your controlling master budget. A common misconception is that the detail budgets somehow roll up to the master budget by definition, this is not true. You must actually budget to a detail account in the master budget; this then serves as the controlling amount for the detail budgets. Master/Detail budgets are used in the budgeting process to control Authority and identify budgets that exceed control limits. They are not intended for reporting purposes.

26. I was able to post a budget journal to a closed period, why?
A budget journal can be posted to any period that is in an open budget year for that budget. This is regardless of the status of that period (closed, opened, or future enterable).
27. Why don’t my budget amounts appear on my FSG?

To include budgets (encumbrances or currencies) in a FSG report, your report definition must specify a row set of column set that has control values specified in the Balance Control options. In the report definition itself, you associate budget names with the control values that are assigned to the row or column set.

Shivmohan Purohit

Reporting SOB – All transactions are with foreign Currency

You have to assign your SOB to your responsibility. Set of book means linking between the 3cs i.e. chart of accounts, calendar, currency and maintain 5 mandatory accounts. Set of books are created keeping in mind the ‘Accounting Structure”. This is a combination of 3 ‘Cs’ – Chart of Accounts, Currency and Calendar. Chart of Accounts is made up of segments- Max of 30 Segments are allowed. Two Segments are mandatory – Balancing and Natural segment, Calendar –This can have a max of 365 periods (daily calendar) and a min of 1 period (Yearly calendar). Periods can be monthly, fortnightly, weekly, daily.